This one should past the moon...but just barely...haha. Modelling time was 100 minutes....but the next one is way within the 90 minute limit. It'll be ready to launch tomorrow :)
I thought I'd take a break from flying machines and move onto...well...other flying machines :) Modelled in 100 minutes and 30 minutes of that was wasted fiddling with the design....as one does when free styling. I think I'll do some more of these before the Wednesday deadline.
It's been slow going, that's one of the problems of designing as you model :) Anyway, here's a vacuum tube piston engine and some nuts & blots as well....oh my.